A comparison of the time a solenoid is energized to the time it is de-energized, expressed as a percentage: Duty Cycle % = [(ON time) / (ON time + OFF time)] x 100. For a given force / stroke requirement the smaller the duty cycle percentage, the smaller the Solenoid.